Is there a time constraint on the construction during competition?

The time constraint for the construction of the fabricated reinforcement will be from the captain’s meeting (when given materials, 6:00pm Friday) until the beginning of the competition time slot (which will be discussed at the captain’s meeting, 7:30-8:00am Saturday). Teams will have 1 hour to place the sand inside the and box with the fabricated reinforcement and pile.